---
title: NEW TRAIN CONTROL SYSTEM IS A GAME CHANGER FOR TASRAIL
date: 2015-01-22T12:44:00+11:00
author: Walker Designs
canonical_url: "https://tasrail.com.au/news/new-train-control-system-is-a-game-changer-for-tasrail"
section: News
---
1. [ Home](https://tasrail.com.au/)
2. [News](https://tasrail.com.au/news)
3. NEW TRAIN CONTROL SYSTEM IS A GAME CHANGER FOR TASRAIL
 
 

 

#  NEW TRAIN CONTROL SYSTEM IS A GAME CHANGER FOR TASRAIL 

An $11 million Advanced Network Train Control System (ANCS) is now operating across the Tasmanian Rail Freight Network, representing the single; largest-ever change to rail freight operations in the State.

 

 

 Post Date### 22 Jan 2015

 

 

 

 

 

 

 

 

  Chief Executive Officer Damien White said the ANCS is a watershed for TasRail and propels the business to deliver modern, innovative, efficient and competitive freight solutions for customers.

The ANCS is a GPS-based system supported by a digital data radio network that ensures significant additional safeguards for both rail movements and track maintenance activities. â€œIt provides much improved visibility of network occupation, combined with GPS-based alarming to warn users of potential occupation and/or speed breachesâ€, Mr White said. â€œBy contrast, the old system was paper-based and required considerable human interaction, meaning that it was vulnerable to human error and resulted in a relatively high number of Safeworking breachesâ€.

Unlike a majority of TasRail"s other major capital projects, Mr White said the ANCS touches all parts of the freight railway operation. â€œBy necessity, the planning and implementation processes are complex and have required comprehensive risk management and change management processesâ€.

Mr White said every employee and contractor interacting with railway network needs to use the new system. â€œThe successful commissioning of the system this week demonstrates the capability of TasRail"s workforce to embrace change and adapt to new technologyâ€.

â€œTo the best of my knowledge, the ANCS is the only single system currently operating in Australia that protects both trains and track workersâ€, he said. â€œAll Tasmanians can be proud that their railway now boasts the most innovative train control system in the countryâ€.

TasRail went through an exhaustive procurement process to select the new system and suppliers with the right experience. The ANCS is supplied by Siemens Rail Automation Pty Ltd, supported by a digital data radio network designed and supplied by Tait Communications. Project support is also being provided by Australasian Railway Consultancy Services, particularly during the planning and implementation phase.

â€œI"m extremely proud of TasRail"s whole project teamâ€, Mr White said. â€œThe passion and commitment by them has been outstanding, and likewise the level of professionalism and support from our employees and key suppliers has been fantasticâ€.

The ANCS project was included in Tasmania"s Rail Recovery Plan and is funded by the Tasmanian Government.

**KEY BENEFITS OF THE ADVANCED NETWORK CONTROL SYSTEM**

- *Fully automated system, reduces the risk of input/output errors and substantially reduced Safeworking breaches*
- *Provides full visibility of all vehicles on the network in real time*
- *Enables early intervention to prevent incidents from occurring or to reduce the severity of incidents*
- *Reduces the risk of an on-track collision and/or derailment*
- *Improves train speed compliance through recording of speed and location data. Will send train handling alarms/alerts to the Locomotive Driver (and the Train Controller) ' for example if a train is travelling over speed limits*
- *Improved capacity to manage and monitor track work and train working by streamlining the transmission and authorisation of network access authorities*
- *Increases productive track access time, significantly improving the efficiency of infrastructure maintenance and upgrade activities*
- *Fuel savings from reduced track access downtime*
- *GPS positioning increases the accuracy of information*
- *Operational efficiencies from improved freight movements and reliability of train operations*
- *Capability to introduce a "track and trace" data facility for customers*
- *Provides Train Controllers with an improved working environment (previous system required an excessively high reliance on procedural compliance)*

 

 

 

 

 

 

 

  [  27 Jan 

 ![low speed derailment near Kimberley](/assets/images/photo-coming-soon.jpg) 

 

 ## low speed derailment near Kimberley

\+ Read More

  

  ](https://tasrail.com.au/news/low-speed-derailment-near-kimberley) 

 [  20 Jan 

 ![TasRail Welcomes ATSB Investigation Report](/assets/images/photo-coming-soon.jpg) 

 ## TasRail Welcomes ATSB Investigation Report

\+ Read More

  

  ](https://tasrail.com.au/news/tasrail-welcomes-atsb-investigation-report)
